PC Ågård – Renewable energy infrastructure in Falkenberg
Paroc Panel System supplied AST® Built-On™ stone wool insulated panels for the building envelope, combined with Dri-Design aluminium façade cassettes.
Supporting the transition to fossil-free heating
Commissioned in 2024, PC Ågård is an important addition to Falkenberg’s district heating infrastructure. The plant supplies fossil-free process and space heating to Arla’s dairy facility in Falkenberg, replacing fossil-based energy and helping to reduce carbon dioxide emissions by approximately 3,000 tonnes annually.
At the same time, the new plant strengthens the local district heating network and creates additional capacity for supplying renewable heat to customers in the growing Ågård and Tröingedal areas.
The facility uses biomass-based fuel, including wood chips, to support fossil-free heat production.